Systematic completion and operational readiness start in the early phase and follow the project all the way. First, how the building must work in operation is described. The tests at the end show that it works, and the organisation is ready to take it into use.

In brief

Systematic completion is a process for the whole project, from the first idea to a building that works in operation.

In advanced buildings such as hospitals, laboratories and airports, the technical installations are tightly linked, like a machine. Ventilation needs power, heating, cooling and automation before it can start, and the nurse call system has to work in every single room. Each of these requirements is set in the early phase and followed all the way to the test that shows it works.

The requirements you set at the start decide what you can test and hand over at the end. Decisions in the early phase cost the least and add the most value. That is why systematic completion is there from the first line drawn, and the tests at the end confirm a plan everyone has worked to.

The operational readiness project is the organisation's own project for taking the building into use. It starts in the concept phase, runs side by side with the construction project and prepares the organisation with work processes, operations and skills. The Norwegian guidance for the early phase of hospital building projects recommends setting it up as early as possible.

Throughout the project

On board from day one

Systematic completion and operational readiness run side by side through every phase. Most of the work happens long before the tests on site.

01

Early phase

Start here
Systematic completion
  • Requirements and function: what the building must do in operation
  • Strategy for completion and ITB
  • Completion requirements in the contract strategy
Operational readiness
  • Operational readiness set up, owned by top management
  • Target picture, operating concept and benefit goals
  • Core operations described
02

Preliminary design

Systematic completion
  • Completion plan with milestones
  • Zoning for completion and testing
  • System structure and interfaces between disciplines
Operational readiness
  • The receiving organisation is staffed
  • Future work processes and roles
  • Benefits realisation plan and baseline measurements
03

Detailed design

Systematic completion
  • System list and functional descriptions
  • Test matrices and ITB coordination
  • Desk tests of technical systems
Operational readiness
  • User involvement on rooms and equipment
  • Operating standards and requirements for operating agreements in the contracts
  • Skills needs and training plan
04

Construction

Systematic completion
  • Self-inspection zone by zone
  • Factory tests and mock-up rooms
  • Testing and start-up in the takt plan
Operational readiness
  • Systematic training starts
  • Equipment and IT in place as planned
  • Move plan and contingency
05

Completion

Systematic completion
  • Mechanical completion
  • Start-up and function tests
  • Integrated tests and full-scale tests
Operational readiness
  • Training in the technical systems
  • Drills and operational tests in the building
  • Operating agreements signed and known
06

Trial operation and operation

Systematic completion
  • Taken into use and trial operation
  • Stability and performance tests
  • O&M documentation and follow-up during the warranty period
Operational readiness
  • Coordinated move-in
  • Core operations fully running
  • Benefits are followed up and measured

The essentials

Five moves that work

01

The whole project

Systematic completion is a process for the whole project, from idea to operation. The tests at the end confirm a plan that was made early.

02

Start with operations

Start with what the building must be in operation, before choosing equipment and drawing. The requirements at the start decide what can be tested at the end.

03

Decide early

Decisions in the early phase cost the least and add the most value. What is settled on paper is solved before it reaches the jobsite.

04

Zones and dependencies

Zones and dependencies are mapped during design, so the building can be completed and tested area by area.

05

Users and operations from day one

Users and the operations organisation are involved from the first day, and operational readiness is planned together with completion.

Step by step

How we plan from area to system

  1. 1

    Requirements and function first

    In the early phase, the client, users and operations describe what the building must do. The requirements become the basis for the system list, the functional descriptions and the tests.

  2. 2

    Build zone by zone

    Installations are mounted in takt, area by area, with self-inspection before the zone is released to the next trade. Testing and start-up have their own place in the takt plan.

  3. 3

    Shift focus to the systems

    When the areas are finished, the work is managed by system. Dependencies set the order: ventilation starts when power, heating, cooling and automation are ready.

  4. 4

    Test together

    Integrated tests and full-scale tests show that the systems work together, with clear milestones up to the building being taken into use.

  5. 5

    Rehearse before opening

    The organisation runs an ordinary day in the building before the first users arrive, and adjustments are made while they are easy.

Operational readiness

Three tracks side by side

Operational readiness matures the organisation along three tracks, in parallel with the phases of the construction project. The better the tracks are described early, the better the rooms, functions and systems.

01

Organisational development

Skills, staffing, roles and new work processes are built up step by step through the whole project, with systematic training from the construction phase.

02

Operations and facility management

Technical operations and support services are mapped early, requirements for operating agreements go into the contracts, and the operations organisation knows what to do the day the building is taken into use.

03

Core operations

The benefits and the target picture set the direction for how the organisation will run in the new building, with new systems and work processes from day one.

Questions and answers

What people ask

When does systematic completion start?

In the early phase. That is where the requirements and functions for the building in operation are described, and the completion strategy is set. The completion plan and zoning come in the preliminary design, test matrices and ITB coordination in the detailed design. International frameworks such as ASHRAE Guideline 0 and CIBSE Commissioning Code M also start with the owner's requirements before design.

When does operational readiness start?

In the concept phase, at the same time as the construction project. The Norwegian guidance for the early phase of hospital building projects recommends that the health trust sets up the operational readiness project as early as possible, and that the preliminary design includes a complete benefits realisation plan.

What is systematic completion?

A structured, management-led process that ensures the project meets all functional requirements within time, cost and quality, from planning to handover. The definition comes from the Norwegian BA2015 programme.

Who owns the operational readiness project?

The organisation that will take the building into use, with the top manager as owner. Operational readiness is responsible for involving users and staff, and works closely with the construction project through one shared plan.

What is a completion plan?

The plan for how the project will be completed: milestones, zones, systems, tests, responsibilities and documentation. It is made in the preliminary design and carried into the contracts, so all parties work towards the same requirements.

What is the difference between start-up and commissioning?

Start-up gets each system running and balanced on its own. Commissioning connects the systems and shows that they work as a whole, with integrated tests and full-scale tests.

What is ITB?

ITB is the Norwegian abbreviation for integrated technical building installations: technical systems that depend on each other, such as ventilation, automation, access control and fire alarms. The standard NS 3935 describes how ITB is handled from design to handover, and ITB tests show that the interplay works.

What is a full-scale test?

A test where the whole building, or large parts of it, faces a real event, such as a power failure or a fire alarm. The test shows that all the systems respond correctly together.

What is an operational test?

A dress rehearsal where the staff run an ordinary day in the building before opening, with work processes, equipment and systems in use. The test shows that the organisation and the building work together.

Why is the closeout planned by system?

Installation follows the location: the trades move zone by zone, so the work flows. Testing and commissioning follow the system, because a ventilation system runs through the whole building and needs power, heating, cooling and automation. That is why the plan shifts from area to system towards the end.

What do you gain from starting early?

Fewer surprises in the closeout, an orderly handover and a building that works from day one. A large study from Lawrence Berkeley National Laboratory found median energy savings of 13 percent in new buildings with systematic commissioning, at a cost of 0.4 percent of the construction cost.

Does operational readiness suit buildings other than hospitals?

Yes. Town halls, schools, universities, laboratories and airports have the same need: the organisation will adopt new systems, routines and roles. Airports call it ORAT, and the UK uses Soft Landings. Both start in the early phase.

Sources

  1. Lean Communications and NTNU: the video courses Hørt – Systematic Completion and Hørt – Operational Readiness
  2. The Norwegian regional health authorities: Guidance for the early phase of hospital building projects (2024)
  3. BA2015: Systematic completion, guidance (Norwegian)
  4. Standards Norway: NS 3935 Integrated technical building installations (ITB)
  5. Whole Building Design Guide: Building Commissioning (ASHRAE Guideline 0)
  6. CIBSE: Commissioning Code M, Commissioning management (2022)
  7. IATA: Operational Readiness and Airport Transfer (ORAT)
  8. BSRIA: Soft Landings Framework
  9. Mills (2009): Building Commissioning. Lawrence Berkeley National Laboratory

Next step

Let's have a talk about your project.

Contact us +47 922 99 572

Tell us briefly what you need, and we'll connect you with the right person. You'll normally hear back within one business day.

OsloConstruction City
Standardveien 1
0581 Oslo
BergenLitleåsvegen 53
5132 Nyborg